Road closure on Wiles Road

Florida Power Light Company will replace two power line poles to improve service reliability in Coral Springs on March 14. A 700-foot section of Wiles Road between Turtle Run Boulevard and the driveway for The Park at Turtle Run development will be closed in both directions.

Detour signs will be placed to instruct drivers of the road closure at Rock Island Road; local traffic can still access eastbound Wiles Road as far as Turtle Run Boulevard.

The work will not require any planned power outages during construction.

Copyright © 2015, Sun Sentinel

Article source: http://www.sun-sentinel.com/local/broward/parkland/fl-cspf-brf-power-0310-20150310-story.html?track=rss

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *